enLanguage
Metal Construction Bridge, Temporary Steel Pedestrian Bridge Bailey Bridge

Metal Construction Bridge, Temporary Steel Pedestrian Bridge Bailey Bridge

Product name:Steel Bailey Bridge Material: Q235/Q345
Size: Customized size
Place of Origin: shandong, China
Send Inquiry
Description

We have determined the overall plan of technical reform development, and invested a lot of human, material and financial resources, new Flux Cored Wire, 304 Stainless Steel Valve Casting, Steel Bailey Bridge and technology innovation. We provide a harmonious working environment and continuously expand the career platform for our employees. We take 'the marketing principle of win-win cooperation, the R & D principle of market recognition, and the production principle of quality priority' as the basic principles of enterprise management. We will make full use of our technical strengths to develop new products that better meet our customers' needs, so that we can gain a head start in this industry competition where opportunities and challenges coexist.

Product Introduction


A Bailey bridge is a type of portable, pre-fabricated, truss bridge. The main steps of the steel structure bailey bridge include measuring and positioning the position of the bridge, pier pouring, assembly of Bailey bridge, installation of Bailey bridge, landing and correcting the position of the main body of the bridge on the other bank, laying of the bridge deck and laying of connecting, etc.


Product Advantage


Because of the use of pre-cast components, so the construction is faster than the traditional concrete bridge, suitable for urban areas. Compared with other Steel structure Bailey Bridge has better shock resistance.


Product Production


image003


There are six independent steel structure production lines. And we set 20 employees to inspect the product at every step of production to ensure the product quality.


Enterprise honor and qualification


03

04


Our products have been exported to many countries, receiving high evaluations from our customers. 

Under the strong management and institutional guarantee of the company, the qualified rate of construction quality has reached 100%, and the excellent rate has reached more than 90%.


Packing & Shipping

2.0

Relying on the advantages of technology research and development in the field of Metal Construction Bridge, Temporary Steel Pedestrian Bridge Bailey Bridge and rich production experience, we can provide customers with one-stop comprehensive solutions such as product design and development, testing, mass production, and follow-up tracking services. We have the ability of independent operation and independent product development, and our products are exported to all over the world. Welcome all friends to place trial order for developing a long-term small business relationship.

Send Inquiry