Product Advantages
1. The construction period of Road-rail Dual-purpose Steel Structure Bridge is very short, the actual construction period can be within a few days. Because all the structural members are prefabricated in the factory, they can be pulled to the site for hoisting.
2. Easy to disassemble. If it needs to be removed later, the bolts can be directly removed, and all the steel can be reused in other buildings.
3. Light and beautiful appearance
4. Convenient post-processing. For example, I need to add components to it and weld them. Many advantages, the above are the main points.
Enterprise honor and qualification


As a High & new technology enterprise, we have rich experience in steel structure production and exporting. In recent years, the company has undertaken a number of construction projects of large and medium-sized steel structure projects at home and abroad.
Product Production

CNC flame cutting machine- an efficient, high-precision, and high-reliability cutting equipment that combines computer control, precision mechanical transmission, and thermal cutting technologies, can accurately cut various complex-shaped plates, and is suitable for construction machinery, steel structure, and pressure. Containers and other manufacturing industries are used as new automation equipment for high-precision sheet thermal cutting.
FAQ
Q1.Why should you choose us?
a. Strong production capacity. Our annual production capacity is up to 300000 ton.
b.International Quality Management System.
c.Perfect After-sales Service System.
d.Advanced Production and detective equipment.
Q2.What makes Road-rail Dual-purpose Steel Structure Bridge special?
A: Steel brings with it a number of significant advantages for bridge design and construction, including: low superstructure weight: leading to smaller and more cost-effective foundations. lighter assemblies for erection: leading to smaller cranes and cheaper site costs.
Q3. What's the delivery time?
A: The delivery time depends on the size and quantity of the building. Generally within 30 days after receiving the payment.
Packing & Shipping














