enLanguage
Cast Aluminum Car Water Pump Die Casting
video
Cast Aluminum Car Water Pump Die Casting

Cast Aluminum Car Water Pump Die Casting

Product name:Cast aluminum car water pump die casting
Material:Zinc aluminum alloy
Brand:Haiyao
Casting method:High pressure casting
Send Inquiry
Description

Production Introduction


In the cylinder block of a car engine, there are multiple water channels for the circulation of cooling water, which is connected to the radiator (commonly known as the water tank) placed at the front of the car through water pipes to form a large water circulation system. There is a water pump, driven by the fan belt, to pump out the hot water in the engine block waterway, and pump in the cold water. There is also a thermostat next to the water pump. When the car is just started (cold car), it is not turned on, so that the cooling water does not pass through the water tank, but only circulates in the engine (commonly known as the small cycle), until the temperature of the engine reaches 95 degrees or more When it is turned on, the hot water in the engine is pumped into the water tank, and the cold wind when the car moves forward blows through the water tank, taking away the heat.


Working principle


Cast Aluminum Car Water Pump Die Casting is generally driven by the crankshaft of the engine through a V-belt. The drive belt is looped between the crankshaft pulley and the water pump pulley. The water pump shaft rotates as soon as the crankshaft rotates, and the water pump shaft drives the impeller to rotate, thereby realizing the conversion of mechanical energy into hydraulic energy.


Company Profile


0febca4cd163b585c0d13bbbc1eabcc

We mainly provide mass production of large and medium-sized sand castings.  The company has established a modern workshop, processing workshop, foundry workshop, electrical workshop, and assembly workshop. The monthly production capacity is up to 600 tons.

FAQ

1. You are a manufacturing factory or trading company?
We are a manufacturing factory. And we have a professional customer service team and regularly visit the tracking service.                                                                                              

2. How about your quality control?

Our products have passed CE EN1090 and ISO9001:2008.


3. What is the delivery time?
Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30 days after receiving the deposit.


Send Inquiry

(0/10)

clearall