The company is committed to the production and development of all types of medium and high-end Grid Steel Structure Project, Tube Truss, Wood Gasifier Generator. The company takes "dedication to green energy, creation of humanistic value" as the core philosophy, and we firmly adopt modern management mechanism. We always adhere to the business philosophy of "enterprise survival depends on products, lasting development depends on research and development". We believe that knowledge and competence are the prerequisite and foundation for companies and individuals to be based in the professional field. We adhere to the concept of open and inclusive development, and constantly explore the establishment of a talent training mechanism conducive to industrial development.
Product Introduction
Heavy Engine Castings are important parts of automobiles. The most widely used in the production of cylinder castings is still wet clay sand. The static pressure molding lines and air blow molding lines with the advantages of good molding performance, low energy consumption, low noise, less pollution, high efficiency, and reliable operation are widely used.
Heavy Engine Castings are relatively light, making them easier to install. Moreover, it can withstand high working temperatures and is not easily deformed. Our castings are recyclable and can be reused many times, which is more environmentally friendly. In addition, our castings offer EMI/RFI shielding, rigidity, and durability with minimal weight. Our products are available in a wide range of sizes to meet different processing and production requirements.
Our advantages
● OEM Quality
● Competitive Priced Parts
● Flexible Volume
● Delivered On Time
● One-Stop Solution
● Trust Assurance Support.
● Dimension accuracy and stability;
● Aluminum Bracket Casting in aluminum;
● For High Volume of Parts, Aluminium Die Castings are the ideal production way;
● Rock Bottom price target by Aluminum Bracket Casting;

Product Parameter
Size Range | Not normally over 2.7feet square |
Parts Weight | 0.01pounds to 14 pounds |
Setup Cost | New die casting tooling is free |
Tolerances | 0.02inch,add0.01inch to 0.015inch across parting line up to part size |
Die Casting Finish | 32~63 RMS |
Minimum Draft | normally 1° |
Billet | normally 0.04inch |
Normal Minimum Section Thickness | 0.060inch for small parts; 0.090inch for medium parts |
Ordering Quantity | For first trial order: not less than 100pcs; Usually 1,000pcs or more. |
Normal Leadtime | Tooling: 4~12 weeks update part size; Samples: one week if no finish and CNC machining required; Production:2~3weeks |
Casting Display


Company Profile


Company Certificate


Application Field

Manufacturing Process

Testing Equipment

FAQ
Q1.What service can you offer?
A: We can offer a one-stop solution for high-pressure die castings from tool engineering, designing & developing, casting, machining, finishing, assembling, packing, and shipping.
● Pre-Sale Design
Provide services to many well-known international and domestic companies throughout the year.
● Sales Tracking
Be a good customer adviser and assistant, so that every investment of the user can get a generous return.
● After-Sales Service
Respect customers, communicate in time, continue to improve, and strive to maximize customer value. The end of sales does not mean the end of service. Continuous and reliable service solves customers' worries.
Q2. What about your prices?
A: Kinds of die casting machines/equipment and skilled engineers will keep our prices very competitive without compromising the part`s quality.
Q3. What is your MOQ?
A: No requirements on the MOQ; Flexible volume is accepted by us in view of this new project growing.
Q4. What is your Quality Control?
A: We encompass this quality management system during manufacturing. Also, some testing equipment helps us to find the problems on time.
Q5. What is your payment term?
A: For tooling/mold cost, 50% as a deposit and the balance paid after samples are approved by the customer. For bulk orders, 30% as a deposit and the balance paid after negotiation.
Q6. What is the delivery date?
A: For tooling/mold, it will take 35~45days which is up to the design. For mass production, it will take 10~30days which is up to your quantity.
It is our collective wish to continuously develop and introduce new Flange Ductile Iron Casting for Heavy Duty Truck and technologies to meet the needs of our customers. Technology is the inexhaustible power of human development, and we rely on scientific and technological progress to promote the rapid and healthy development of the enterprise. Our company has strong technical force, sound quality assurance system, complete equipment conditions, complete testing methods, and products are produced in strict accordance with industry standards.











